最近韩国电影高清免费观看HD,人妻少妇久久中文字幕,国产下药迷倒白嫩美女,潘金莲扬思敏全集1一5集三级

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: m.pf1996.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
亚洲蜜芽在线观看精品一区| 色8狠狠色狠狠色综合久久 | 亚洲欧美妆和亚洲妆的区别| 欧美熟妇浓毛大BBW| 国产精品偷伦视频免费观看了 | 五十路○の豊満な肉体| 国产男女爽爽爽免费视频| 亚洲国产精品久久人人爱| 玩弄japan白嫩少妇hd小说| 狠狠干狠狠爱| 男同gv在线观看免费| 后入内射无码人妻一区| 精品呦啊呦v视频在线观看| 美女黄网站视频免费视频软件| 性欧美XXXXX乱极品少妇| 亚洲国产成人久久一区二区三区| 亚洲精品国产熟女久久久| 人妻巨大乳一二三区| 久久上司侵犯部下人妻| 暴虐SM灌浣肠调教A片男男| xx性欧美肥妇精品久久久久久| 丰满人妻被黑人猛烈进入| 公翁大龟挺进秀婷小说| 中文无码成人精品久久久久| 久久无码人妻一区二区三区| 久久久久久久亚洲AV无码| 国产五月色婷婷六月丁香视频 | 无遮挡很黄很黄的视频| 亲妺妺乱的性视频| 国产丝袜视频一区二区三区| 办公室丰满秘书BD正在播放| 一本大道熟女人妻中文字幕在线 | 九色丨PORNY丨蝌蚪视频| 秋霞影视欧美高清av片| 紫川动漫在线观看免费完整版| 狠狠色噜噜狠狠狠777米奇小说| 调教超级YIN荡护士H| 6080YYY午夜理论AA片| 国产SM主人调教女M视频| 成人精品一区二区三区中文字幕| 女人与公狍交酡过程高清视频|